Bond Vote
Welcome to Our Bond Vote Page
We are dedicated to maintaining and improving our school facilities to provide the best learning environment for our students. This page will be your go-to source for the latest information on our school building improvement project. A community vote will take place on September 24. View our presentations and information below on and how these enhancements, which will not increase the tax levy, will result in dramatic learning environment improvements for students. Thank you for your continued support and interest in our facilities initiatives.
BOND VOTE RESULTS
Yes: 1,126
No: 338
Church Information
Bond Webinar- September 9, 2024
Bond Newsletter
Bond Video
Facilities Presentations
Frequently Asked Questions
Letters & Correspondence
Voter Registration
Timeline
Traffic Study
The traffic study was performed to collect existing traffic data at key locations and to identify school related traffic volumes. The study establishes baseline conditions and estimates for additional volumes in relation to the proposed project plans. The information gathered and analyzed highlights the impacts of roadway configurations and possible mitigation measures. Click here to view the report.
SEQRA
Please note the documents below relative to the State Environmental Quality Review Act.
- Presentation to Board of Education on November 14, 2023
- Resolution approved by Board of Education at April 14, 2024 meeting
- AMD Driveway extension supporting document
Church
- The State Historic Preservation Office (SHPO) review is taking place and is in relation to the Rectory that is adjacent to the Church and will be the new location for the 3-Story Classroom Addition.
- After the District purchased the building it was decided as a team to include the renovation to the building in the proposed scope of work for the upcoming Bond Project.
- Hazardous material abatement has been completed in the Church so that the design team could get into the building to do their field measurements and observations as part of the design process.
- The proposed renovation to the Church includes a new 2 story Theater/Dance performance space with balcony seating that includes the original Church Organ as a focal point. In addition, there will be new classrooms and support spaces in the Church and it will be connected to a 3 story classroom addition that also serves as a physical connection from the Church to Ossining High School for better overall circulation.
Facilities Survey Results
In December 2023 the District conducted a facilities survey to gather feedback from our Ossining community regarding our facilities projects. Below please find links to the results.